It's been about 5 months since we closed on the new warehouse. And I'm not going to lie, this process has been stressful. Communication issues throughout and it's just frustrating beyond belief. One up side - the trades are doing a really quality job. We've been very impressed with the work so far. It's just pulling teeth to get things done the way we want and in a timely manner. We are close. Close to being done, but at the same time... so so far.
As a reminder of what the space looked like before, check out "All the Things"
Here's an update from the start!
Demo
Framing out the new windows
BEFORE new skylights...
AFTER new skylights were installed. Same area, same time of day, no overhead lights on. So bright!
Insulation has been a LONG process. Mostly because after the major winter storm, we noticed snow and ice inside the building. We told our GC to make sure everything was sealed BEFORE insulation was installed....
Needless to say.... that didn't happen. We are STILL experiencing leaking issues that we're having to fix on the fly.
First floor framing
Second floor framing
Framing just about complete
One side drywall
Stairs! Becky was excited about that. Apparently she's not a fan of my scissor lift skills. haha
View from the upstairs into the warehouse
Pano of the second floor
Most recent happenings? New garage doors and warehouse AC